A bowtie risk assessment maps every route from a hazard to harm, and the controls on each route. You build it from left to right: the threats that could cause the top event and the preventive controls that stop them, then the consequences that could follow and the recovery controls that limit them. Centrik draws the bowtie for you and shows the health and effectiveness of every control on it.
Before you start
- The Bowtie risk methodology must be enabled for your organisation.
- You need an access right that lets you create risk assessments. Adding escalation factors needs Risk Manager.
- Set up your risk controls first, and a consequence template if you have one. See Configuring Risk Controls and Control Sets and Consequence Templates.
- The Set-Up, Evaluation and Decision phases work as for any assessment. This article covers what is different for a bowtie. For the general steps, see Creating a Risk Assessment (Setup Phase) and (Evaluation Phase).
1. Set up the assessment
- Go to Risk, choose the risk subsystem and open the Assessments tab.
- Click + Add Risk Assessment.
- Enter a Name that describes the hazard, for example "Runway excursion". This name appears at the centre of the bowtie.
- Set Assessment Methodology to Bowtie.
- Complete the remaining fields, including the required Assessor, and click Save.
2. Record the top event
The top event is the moment control is lost, for example "Aircraft departs the paved runway surface during landing". The field appears once the assessment is saved.
- On the assessment, click Edit.
- Enter the Top Event.
- Click Save.
3. Add threats
A threat is a cause that could lead to the top event. In a bowtie, each row of the Hazards Summary is a threat.
- Open the Evaluation phase and click Edit.
- Click + Add under the Hazards Summary.
- Type the threat, for example "Runway incursion by vehicle during landing roll".
- Repeat for each threat, then click Save.
Each threat then shows its highest scores, health, actions, linked reports and findings.
Click a threat's name, or its Assess button, to open it.
4. Add preventive controls
Preventive controls stop a threat from reaching the top event.
- On the threat page, click + Add Risk Control... in the Preventive Risk Controls panel.
- In Find Risk Control or create new..., type part of the control's number or name and pick it from the list. Click More options to filter by risk subsystem, control set or default control context.
- If the control does not exist, type its name and click Add managed to create a reusable control, or Add unmanaged for a one-off.
- In Description of Use, say how the control works against this threat.
- Check the Control Context: Current for a control in place, Planned for one you intend to introduce.
- Click Save.
Each control on the threat shows its health and effectiveness. Click the pencil icon to reopen the pop-up, or the cross to remove the control from this threat. Removing it here does not affect the control elsewhere.
5. Add consequences
A consequence is an outcome that could follow the top event. You can add them from a template or one at a time.
From a template (recommended): click Apply Consequence Template, choose the template, check the entries and click Apply. The consequences arrive with their Main Impact and default recovery controls. See Consequence Templates.
One at a time: click + Add in the Consequence panel, enter the consequence and choose its Main Impact, then click Save.
6. Add recovery controls
Recovery controls limit the outcome once the top event has happened.
- In the consequence's Current Risk Controls column, click + Add Risk Control....
- Find or create the control as in step 4, add a description of use and click Save.
Recovery controls added by a template are already in place. Add any that are specific to this threat.
7. Add escalation factors
An escalation factor is a condition that weakens a control, such as crew fatigue weakening a go-around policy. Recording it shows where a control is less reliable than it looks, and lets you attach the controls that defend against it.
- On the threat page, click the pencil icon beside the control.
- In the pop-up, scroll to Escalation Factors and click + Add Escalation Factor.
- Enter an optional Number, a Name and an optional Description. The Control Application shows which control and threat the factor applies to.
- Click Save.
- On the saved escalation factor, click + Add Risk Control... under Escalation Risk Controls to add the control that defends against the factor, for example a fatigue risk management system. Find it as in step 4 and click Save.
The factor then appears under its control on the threat page, and on the bowtie.
8. Score each consequence
Each consequence is scored on the 5×5 risk matrix, before and after action, as in any assessment.
- On the threat page, click Edit.
- Click the score in a consequence's Before Action box. The Risk Matrix opens.
- Click the cell for the severity and likelihood. Click Clear to remove a score.
- Repeat for After Action.
- Click Save.
The threat's highest score is shown at the bottom of the consequence table and on the Evaluation phase.
Add actions to a control
If a control on this assessment needs improving, raise the action on the control's application so it stays tied to this risk.
- Click the pencil icon beside the control.
- In the Actions panel of the pop-up, click + Add action.
- Complete the action form and click Save.
View the bowtie
Click View Bowtie on the assessment or any threat page. Use Assessment and Bowtie at the top right to switch between the forms view and the diagram.
| Element | What it shows |
|---|---|
| Left-hand boxes | Threats, with the number of preventive controls |
| Centre | The hazard (the assessment name) |
| Boxes between | Controls, each with its effectiveness and health |
| Small yellow boxes | Escalation factors, linked to the control they weaken |
| Right-hand boxes | Consequences, with the worst-case score. Consequences from the same template entry are shown once. |
Use the toolbar to zoom in and out and to fit the diagram to the screen.
Click any control to see why it has its rating: each health monitor with its status, and every safety report that assessed it within the effectiveness window.
Planned controls are drawn on the bowtie but do not count towards health and effectiveness on the threat or consequence, because they are not yet in place.
Switch methodology
A Risk Manager can move an in-progress assessment between Bowtie and Hazards and Consequences. On the assessment, click Switch Methodology and confirm. Only the presentation changes. Threats, consequences, controls and scores are kept.